The Phase 2 Parking Garage is a design-build project that includes designing and constructing a parking garage with 750 parking spaces within a multi-level parking structure. This project is currently in the design phase.
Design started in Spring 2020.
Construction begins in Fall 2020 and ends in early 2022.